
MODULAR CONSTRUCTION COMPANY · POLAND & THE BALTICS
From inquiry to a project a manufacturer can actually build
We prepare modular and prefab projects so factories in Poland and the Baltics can price and deliver them realistically. Experienced engineers and project managers, on your side.
60+
projects
5,000+
m²
7
countries
Germany: a two-storey serial multi-family residential building, KfW 40 standard.
Our services
Our aim is to help create good living environments for people.
We assess site, scope and cost corridor and give you a Go/No-Go.
A shortlist of manufacturers, an RFQ package and a comparison of offers. You choose.
We coordinate the project on your side from the signed order to the handover of the building.
Architectural design for off-site manufacturing, product development, BIM, modularisation and optimisation of construction projects.
Architectural and landscape design, evidence-based research, visualisations and physical models.
Process maps, business structure, project task management, ERP/CRM, feasibility studies and financial assessment.
How we work
Three parties, one shared schedule. We keep the client, the manufacturer and the site in step.
1
Inquiry
You send your project through the form.
2
Concept design & design development
We assess site, scope and cost corridor and give you a Go/No-Go.
3
Manufacturer selection
Shortlist, RFQ package, comparison of offers. You choose.
4
Contracting
You sign with the manufacturer and the contractors.
5
Preparation
We coordinate design data, permits and site readiness.
6
Delivery and installation
We coordinate transport, installation and acceptances.
7
Handover
We prepare the handover of the finished building.
Clear scope
We are not the architect or structural engineer of record.
We are not the general contractor.
We coordinate schedules. We do not promise fixed dates, because delivery and installation depend on parties outside our control.
Who you will work with
VMBS.TECH, based in Tczew (Poland) and Riga (Latvia), is today a collaboration of professionals in volumetric modular construction. We work with developers, investors and intermediaries who want to bring a modular or prefab house project to a manufacturer with a realistic concept. We are a remote team working effectively together on projects worldwide.
Pavlo Borysovets
Strategy, production, construction
Civil engineer. Project manager, modular construction and built environment professional.
MSc in Industrial and Civil Engineering.
MSc in Economics and Management.
20+ years in construction and real estate development.
Special projects manager at modular house manufacturers in Poland.
Founder of VMBS.TECH.
Ivan Moiseenko
Design, project management
Architect, project manager, modular construction and built environment professional.
MSc in Management in the Built Environment.
MSc in Architecture and Construction Engineering.
Founder of IMAGE, an MMC and engineering consultancy.
Author of “MMC business process. Road map based on RIBA framework”.
Case studies
Track record of our team
Design for Manufacture & Assembly projects all over the globe.
Implementation of project management strategies, instruments and tools in the AEC industry.
Consultation and guidance in architectural design, modular development, CV and portfolio compilation and more.
– Germany: more than 20 individual houses to a high energy standard, built together with partner timber-frame factories.
– Germany: a hotel – design, production, installation and service.
– Germany: a multi-apartment building.
– Germany: a three-storey serial modular residential building; airtightness test n50 = 0.52.
– Netherlands: four private year-round houses of about 70 m², each made of two modules, and a seven-module building with 3 apartments for a care home.
– Modular rental apartment complex, Montenegro — MMC real estate development in the Balkans.
– Modular wooden hotel in Iceland — 4-star hotel with 120 rooms, spa and lounge.
– Multi-storey apartment complex, Žabljak, Montenegro — MMC feasibility studies and massing models.
– 2-storey modular hotel — Modular hotel design and development.
– Modular healthcare — Precast concrete modular healthcare project.
ARC — Automated Robotic Complexes
A project we are developing on automation and robotisation of production and assembly sites, off-site and on-site.
Instead of one universal system, a set of specialised automated cells is brought to the production or construction site, installed in fenced zones with defined material hand-over points, and then works autonomously, with no people inside the zones.
Insights
31 October 2026 · Ivan Moiseenko · 5 min read
A summary of the 66-page brochure by Ivan Moiseenko: RIBA Plan of Work stages 0–7 adapted to modular and off-site projects, the main deliverables of each stage, and how UK, German and Montenegrin stage structures compare. Free PDF inside.
24 October 2026 · Ivan Moiseenko · 3 min read
How IMAGE ran an RFI/RFP among 24 European off-site manufacturers for 37 prefab wooden houses of a spa resort in Montenegro, and why a company from Kosovo was pre-selected.












